Description: This layer was created by the project tool using the "AddressPoints_TCOMM" layer as input. This layer was created so we had an address points layer in State Plane 83/91 HARN coordinate system (which is our City standard.)Last updated: 2/5/2015.Matt StullGIS CoordinatorCity of Tumwater